A little planning helps the work start smoothly, keeps the site safer, and protects the finished result.

Preparation checklist
Your final scheduling notes and proposal take priority; this guide helps you know what to expect.
Remove belongings from all areas included in the continuous flooring run.
Keep the space within the manufacturer’s required temperature and humidity range.
Cabinets, islands, and other fixed items affect floating-floor sequencing.
The combined floor and underlayment height may affect doors and transitions.
Follow guidance for furniture placement, felt protection, and immediate post-installation care.
Before installation day
Keep entrances, hallways, stairs, elevators, and the path to every work area open.
Arrange a separate safe area away from tools, materials, dust, adhesives, and active work.
Know who handles furniture, appliances, plumbing, doors, trim, disposal, and other coordinated work.
Provide parking, keys, codes, building rules, work hours, and the best day-of contact.
Questions before the work?
Every site is different. Contact our team if access, furniture, timing, moisture, or other conditions are unclear.