Finished living space with professionally installed luxury vinyl flooring

East Hampton, CTMiddlesex County

Flooring Installation in East Hampton, Connecticut

Plan time-sensitive rental-property flooring replacement with removal, subfloor preparation, gluedown luxury vinyl, carpet, and finish details coordinated in one scope. In August 2026, Floors Now completed this East Hampton project for a local real-estate professional in one workday and met the property's rental-readiness deadline.

Local showroom

2516 Berlin Turnpike, Newington, CT 06111

Recent local proof

Kitchen, bathroom, hallway, living room, two bedrooms, and closets • August 2026

Project support

Rental-turnover scheduling, flooring removal, subfloor back-screwing and patching, gluedown LVP, carpet and pad, and finish details

Completed project in East Hampton

Browse All Projects

Completed August 2026

Karndean and Mohawk Flooring for a One-Day Rental Turnover

In August 2026, a local real-estate professional needed an East Hampton property prepared for rent by a specific deadline. Floors Now removed and disposed of the existing floating LVP and carpet, back-screwed 253 square feet of subfloor, and used Planiprep SC and PROMA Pro Patch for surface preparation. The crew fully glued down 280 square feet of Karndean LooseLay Lemon Spotted Gum in the kitchen, bathroom, and hallway, then installed 630 square feet of Mohawk Treasure Valley carpet in Honey Butter with new pad through the living room, two bedrooms, and closets. Appliance moving, toilet removal and reset, cove base, and two threshold or end-cap details were included. The complete flooring scope was finished in one workday and met the customer's rental-readiness deadline.

The customer, brokerage, and property address are not identified to protect client and property privacy.

Karndean Lemon Spotted Gum vinyl flooring through an East Hampton kitchen, hallway, and bathroom
Installation-day view of glued-down Karndean LooseLay Lemon Spotted Gum through the kitchen, hallway, and bathroom during the one-day rental turnover.
Mohawk Treasure Valley Honey Butter carpet in an East Hampton living room and adjoining bedroom
Installation-day view of Mohawk Treasure Valley carpet in Honey Butter across the living room and an adjoining bedroom, installed with new pad for the rental turnover.

Project facts

Completed
August 2026
Project
Residential rental-property luxury vinyl and carpet replacement
Rooms
Kitchen, bathroom, hallway, living room, two bedrooms, and closets
Flooring
Karndean LooseLay Lemon Spotted Gum, fully glued down; Mohawk Treasure Valley carpet in Honey Butter with pad
Installed area
280 square feet of LVP; 630 square feet of carpet and pad
Elapsed work time
One workday
Project goal
Prepare the property for rental by the customer's required deadline

Scope of work

Removal, subfloor preparation, two flooring systems, and finish work were coordinated in one day.

  • Removed and disposed of 253 square feet of existing floating LVP
  • Removed and disposed of 528 square feet of existing carpet
  • Back-screwed 253 square feet of subfloor and completed preparation with Planiprep SC and PROMA Pro Patch
  • Moved appliances and removed and reset the toilet as required for the flooring work
  • Fully glued down 280 square feet of Karndean LooseLay Lemon Spotted Gum in the kitchen, bathroom, and hallway
  • Installed 630 square feet of Mohawk Treasure Valley carpet in Honey Butter with new pad in the living room, two bedrooms, and closets
  • Completed the specified cove base and two threshold or end-cap details

East Hampton flooring FAQ

Questions to settle before installation day.

Can luxury vinyl and carpet be installed as one East Hampton rental-turnover project?

They can when product readiness, removal, preparation, room access, adhesive requirements, finish work, and crew scheduling support the plan. This East Hampton project combined gluedown luxury vinyl, carpet and pad, removal, preparation, and finishing in one workday. Other projects may require a different schedule.

What preparation can be needed when replacing floating LVP with gluedown luxury vinyl?

After the floating floor is removed, the exposed subfloor should be checked for stability, flatness, damage, and surface conditions that could affect adhesive bonding. This project included back-screwing 253 square feet of subfloor and preparation with Planiprep SC and PROMA Pro Patch before the new Karndean flooring was fully glued down.

Can appliance moving and toilet removal and reset be included with flooring?

They may be included when they are identified and agreed upon before installation. Access, appliance type, utility connections, toilet condition, flooring height, and the responsibilities of other trades should be reviewed during planning. This East Hampton scope included appliance moves and toilet removal and reset.

How should landlords and property managers plan flooring around a rental deadline?

Confirm the flooring selections, quantities, removal scope, property access, preparation needs, appliance and fixture coordination, trim details, and required completion date as early as possible. Product availability, exposed subfloor conditions, adhesive requirements, and other make-ready work can affect the final schedule.

Do you install rental-property flooring for real-estate agents and brokers in East Hampton?

Floors Now can coordinate residential flooring projects for property owners and real-estate professionals preparing a home for rent or sale. The plan can account for removal, durable flooring selections, room access, other property work, and a target readiness date without identifying the client or property publicly.

Plan a East Hampton flooring project

Tell us which rooms and flooring you are considering.

Share the East Hampton property type, rooms, existing flooring, preferred materials, known subfloor conditions, appliance or toilet coordination, and required timing. Whether you are a homeowner, landlord, property manager, real-estate agent, or broker, our team will review the scope and follow up about the most practical next step.

Step 1 of 4

About 60 seconds

What flooring is involved?
What type of project is it?
Who will handle installation?