Finished living space with professionally installed luxury vinyl flooring

Wethersfield, CTHartford County

Flooring Installation in Wethersfield, Connecticut

Plan basement subfloor preparation, scheduling, and gluedown luxury vinyl with our Newington showroom team. This Wethersfield project paired complimentary material storage with extensive concrete leveling before the finished floor was installed.

Local showroom

2516 Berlin Turnpike, Newington, CT 06111

Recent local proof

Finished half-basement • July 2026

Project support

Coordinated material storage, self-leveling underlayment, skim coating, and gluedown LVT

Completed project in Wethersfield

Browse All Projects

Completed July 2026

Karndean Wellington Oak Installation After Extensive Slab Preparation

The homeowner was finishing half of this Wethersfield basement and needed other contractors to complete their work before the flooring installation. Floors Now stored the selected material at no charge for several months until the space was ready. Once scheduled, the team poured MAPEI Novoplan Plus self-leveling underlayment on Friday to address substantial low areas in the concrete and used a skim coat for the final surface preparation. On Monday, Floors Now completed 385 square feet of Karndean Van Gogh Gluedown Wellington Oak, giving the renovated basement a warm wood-look finish.

Karndean Wellington Oak gluedown luxury vinyl installed in a finished Wethersfield basement room
Completed Karndean Wellington Oak flooring after extensive concrete leveling and skim-coat preparation.
Karndean Wellington Oak flooring continuing through connected finished basement spaces in Wethersfield
Wellington Oak carried through the connected basement spaces after the Friday leveling and Monday flooring schedule.

Project facts

Completed
July 2026
Project
Residential basement gluedown LVT installation
Rooms
Finished half-basement
Flooring
Karndean Van Gogh Gluedown Wellington Oak (VGW53T)
Installed area
385 square feet
Elapsed work time
Leveling poured Friday; flooring completed Monday
Project goal
Finish the remodeled half-basement with the homeowner's selected wood-look flooring after the other contractors completed their work

Scope of work

Extensive concrete preparation came before the gluedown flooring.

  • Stored the selected flooring at no charge for several months while the homeowner coordinated other basement contractors
  • Scheduled flooring work after the homeowner's previous-floor removal and the remaining basement construction
  • Poured MAPEI Novoplan Plus self-leveling underlayment on Friday to address substantial low areas
  • Applied a skim coat as part of the final concrete-surface preparation
  • Installed 385 square feet of Karndean Van Gogh Gluedown Wellington Oak and completed the flooring work on Monday

Wethersfield flooring FAQ

Questions to settle before installation day.

Can glue-down LVT be installed directly over a concrete slab?

It can when the concrete is clean, dry, sound, smooth, within the flooring and adhesive moisture limits, and otherwise suitable for the selected system. Patching, grinding, leveling, priming, or moisture control may be required first.

Why is floor flatness important for glue-down luxury vinyl?

Glue-down LVT closely follows the surface beneath it. Ridges, low areas, cracks, adhesive residue, and other irregularities can affect appearance, bonding, and long-term performance, so the substrate may need patching, grinding, skim coating, or leveling first.

Does every concrete floor need self-leveling underlayment?

No. Preparation should match the actual slab and the flooring manufacturer's requirements. Some floors need only localized patching or a skim coat, while others have larger variations that require a compatible self-leveling product.

Does a concrete slab need moisture testing before glue-down LVT?

Often, and the selected flooring or adhesive manufacturer may require it. Concrete moisture conditions should be evaluated using the specified method before the installation system is finalized. The appropriate testing, primer, moisture-control system, and preparation depend on the slab, site conditions, and manufacturer instructions.

How soon can flooring be installed after a leveling product is poured?

Drying time varies with the leveling product, application depth, temperature, humidity, substrate, and flooring system. Installation should begin only after the applicable manufacturer requirements have been met.

Plan a Wethersfield flooring project

Tell us which rooms and flooring you are considering.

Share the Wethersfield project location, rooms, existing flooring, preferred material, known concrete conditions, related renovation work, and timing. Our team will review the scope and follow up about the most practical next step.

Step 1 of 4

About 60 seconds

What flooring is involved?
What type of project is it?
Who will handle installation?