Before the project

Prepare for shower and tub-surround installation.

A little planning helps the work start smoothly, keeps the site safer, and protects the finished result.

Large-format wall tile and mosaic floor tile in a finished walk-in shower

Preparation checklist

Five steps before we arrive.

Your final scheduling notes and proposal take priority; this guide helps you know what to expect.

01

Complete the design early

Confirm tile, drain, plumbing fixtures, niches, glass, curb, and accessibility details.

02

Coordinate licensed trades

Plumbing, electrical, framing, and glass work must follow the agreed sequence.

03

Plan for downtime

Demolition, waterproofing, testing, tile, grout, and cure periods make the area unavailable.

04

Provide nearby staging

Tile and related materials need a protected, accessible storage location.

05

Do not rush first use

Follow the final cure guidance before exposing the assembly to water.

Before installation day

Simple site readiness.

Create a clear route

Keep entrances, hallways, stairs, elevators, and the path to every work area open.

Protect people and pets

Arrange a separate safe area away from tools, materials, dust, adhesives, and active work.

Confirm responsibilities

Know who handles furniture, appliances, plumbing, doors, trim, disposal, and other coordinated work.

Share access details

Provide parking, keys, codes, building rules, work hours, and the best day-of contact.

Questions before the work?

Let's clear them up early.

Every site is different. Contact our team if access, furniture, timing, moisture, or other conditions are unclear.