Finalize the wet-area design
Confirm shower dimensions, curb or curbless entry, drain, niches, benches, fixtures and waterproofing limits. Identify steam or other demanding exposure before selecting the system.
Newington showroom • Serving Connecticut
Before the project
A little planning helps the work start smoothly, keeps the site safer, and protects the finished result.

Preparation checklist
Your final scheduling notes and proposal take priority; this guide helps you know what to expect.
Confirm shower dimensions, curb or curbless entry, drain, niches, benches, fixtures and waterproofing limits. Identify steam or other demanding exposure before selecting the system.
Agree on framing, plumbing, drains, waterproofing, tile and final connections. Complete required supporting and plumbing work in the planned sequence.
Remove belongings and confirm access, protected storage, parking, keys or codes, building rules, permitted hours and a day-of contact. Keep children and pets outside active work zones.
Maintain required conditions and uninterrupted curing, inspection and test windows. Plan for the wet area to remain unavailable; schedule tile and later trades only after approval to proceed.
No later trade should puncture or modify the finished waterproofing without coordination. Confirm tile and mortar compatibility and the inspection record before the system is covered.
Questions before the work?
Every site is different. Contact our team if access, furniture, timing, moisture, or other conditions are unclear.