Protection behind the finish

Waterproofing, planned around your space.

Wet-area preparation designed as a complete protective system beneath the visible tile finish.

Teal waterproofing membrane applied to a walk-in shower before tile

A complete project

The details underneath the finished result.

Tile and grout are not the waterproofing layer. Showers and other wet areas require a continuous, correctly detailed system at floors, walls, seams, penetrations, drains, transitions, and movement locations.

We'll review the conditions, explain the scope, and help you understand the decisions before work begins.

Core scope

What the service covers.

View the full scope →
01

System selection

A compatible sheet, liquid, board, drain, and accessory system is selected for the application.

02

Substrate readiness

Supporting surfaces, slopes, fasteners, joints, and transitions are prepared as required.

03

Continuous membrane

The waterproofing layer is installed across specified wet-area surfaces.

How it works

A clear path from plan to finish.

Step 1

Review the space

We confirm room conditions, access, measurements, and the details that affect the work.

Step 2

Build the plan

We coordinate material, preparation, layout, transitions, and the right approach for the wet-area assembly.

Step 3

Complete the work

Our installation team follows the agreed scope while protecting adjacent areas and keeping the job organized.

Step 4

Walk through the result

We review the finished work, care guidance, and any final project details with you.

How to prepare for this service →

Local project guidance

Let's talk through the space.

Our Newington team can help clarify the scope, material needs, timing, and next practical step.

Call Now

Your project

Tell us what you need.

No measurements or perfect plan required.

Step 1 of 4

About 60 seconds

What flooring is involved?
What type of project is it?
Who will handle installation?