Verified flooring case study • Bristol, CT • Completed June 2026

Karndean Golden Kent Ash Installation Before New Cabinets

Install a continuous wood-look floor through the connected rooms before the new cabinets

Residential Project · Residential Home

Loose VCT preparation396 sq. ft. gluedown floorOne-day installation
Engagement
Residential Project · Residential Home
Installed area
396 square feet
Elapsed work time
One workday

Project overview

The goal, materials, and finished scope.

In June 2026, Floors Now completed a 396-square-foot kitchen and living-room flooring project in Bristol in one workday. Loose and chipping VCT left an unsuitable surface for the selected gluedown flooring, so the crew stabilized affected areas, installed Ultraply underlayment where needed, and used MAPEI Planiprep for surface correction. Karndean Art Select Golden Kent Ash was then installed before the new cabinets, with two reducers, a stair nose, and the specified baseboard work completing the flooring scope.

Project facts

Completed
June 2026
Documented scope
Residential kitchen and living-room gluedown luxury vinyl installation
Property type
Residential Home
Rooms
Kitchen and living room
Flooring
Karndean Art Select Golden Kent Ash gluedown luxury vinyl
Project goal
Install a continuous wood-look floor through the connected rooms before the new cabinets

Project photography

Available views from the project.

Each image and caption identifies the portion of the verified project that is actually shown.

Karndean Art Select Golden Kent Ash flooring extending from a Bristol living room into the kitchen before cabinet installation
View 1.Golden Kent Ash carried through the living room and kitchen before the new cabinets were installed.
Karndean Art Select Golden Kent Ash flooring installed across a Bristol living room beside the entry and staircase
View 2.Installation-day view of the living room, entry, and stair after surface preparation and flooring installation.

Scope of work

Loose, chipping VCT required stabilization and surface preparation before the gluedown installation.

  • Stabilized problem areas and back-screwed affected subfloor sections
  • Installed Ultraply underlayment where needed and used MAPEI Planiprep for surface correction
  • Installed 396 square feet of Karndean Art Select Golden Kent Ash through the kitchen and living room
  • Completed the flooring installation before the new cabinets were installed
  • Finished the flooring scope with two reducers, one stair nose, and the specified baseboard work

Products and planning

Research the flooring and installation details.

Use these resources to compare the materials, preparation, and installation services involved in this project.

Flooring Advice

Go deeper on luxury vinyl.

Focused answers for the questions that need more room than a buyer's guide.

Browse all Flooring Advice

Plan a project like this Bristol installation

Tell us about your rooms, flooring, and project goals.

Share the location, rooms, existing floors, materials you are considering, known preparation needs, and timing. Floors Now will review the details and follow up about the most practical next step.

Step 1 of 4

About 60 seconds

What flooring is involved?
What type of project is it?
Who will handle installation?