The old laminate in this basement was damaged, and moisture was a concern in the space. Laminate is particularly unforgiving in damp conditions — once the core takes on moisture and swells, patching or refinishing cannot bring it back.
The crew removed and disposed of the damaged laminate, installed a plastic moisture barrier with taped seams as part of the floor assembly, and floated about 450 square feet of COREtec Norwegian Maple luxury vinyl plank over it. Quarter-round and the specified transitions finished the perimeter and adjoining edges, and the work was completed in one full workday.
Project overview
The goal, materials, and finished scope.
The homeowners wanted to replace old, damaged laminate in their Berlin basement. Floors Now removed and disposed of the existing floor, installed a plastic moisture barrier as part of the floor assembly because moisture was a concern, and installed COREtec Norwegian Maple luxury vinyl plank across approximately 450 square feet. The work was completed in one full day.
Project facts
Completed
July 2026
Documented scope
Residential basement LVP replacement
Property type
Residential Home
Rooms
Finished basement
Flooring
COREtec Norwegian Maple luxury vinyl plank
Project goal
Replace old, damaged laminate
Project photography
The finished result.
Each image and caption identifies the portion of the verified project that is actually shown.
View 1.Completed COREtec Norwegian Maple flooring across a Berlin basement living area and hallway.
Scope of work
What we did, step by step.
A basement replacement planned around moisture concerns.
1Removed and disposed of the existing damaged laminate
2Installed a plastic moisture barrier and taped its seams
3Installed COREtec Norwegian Maple luxury vinyl plank as a floating floor
4Installed quarter-round and the specified transitions to finish the perimeter and adjoining edges
Common questions
Questions homeowners ask about this kind of project.
What replaced the damaged basement laminate?
COREtec Norwegian Maple luxury vinyl plank, installed as a floating floor across approximately 450 square feet of finished basement.
What is a floating floor?
A floor whose planks lock together and rest over the subfloor or moisture barrier without being glued or nailed down. This basement floor was installed floating, with quarter-round and the specified transitions finishing the perimeter and adjoining edges.
Can a basement flooring replacement be finished in one day?
Yes. The laminate removal, the moisture-barrier installation, and the LVP installation were all completed in one full workday.
What moisture protection was built into this floor?
A plastic moisture barrier with taped seams, installed as part of the floor assembly because moisture was a concern in this basement. Whether a separate barrier is needed varies with the substrate, the conditions, and the manufacturer's requirements.
Products and planning
Planning a similar flooring project?
Use these resources to compare the materials, preparation, and installation services involved in this project.
Learn when Luxury Vinyl uses attached padding, separate underlayment, a moisture layer, adhesive, or no added layer—and why the product instructions decide.
Compare waterproof hardwood, Luxury Vinyl, laminate, tile, and other water-resistant flooring claims without confusing the floor with a watertight room.
Tell us about your rooms, flooring, and project goals.
Share the location, rooms, existing floors, materials you are considering, known preparation needs, and timing. Floors Now will review the details and follow up about the most practical next step.