Karndean Sterling Quartzite stone-look luxury vinyl flooring connecting a Kensington kitchen and laundry area

Berlin, CT • Hartford County

Flooring Installation in Berlin, Connecticut

Explore six featured flooring projects across Berlin and Kensington. A September 2026 Kensington project used a floating installation of Karndean Art Select Sterling Quartzite through a kitchen, laundry area, and connecting hallway, with subfloor preparation, appliance moving, a toilet reset, door clearance, and transitions. Other featured work includes natural hardwood and stair refinishing, an August Kensington kitchen remodel, Kensington carpet repair, commercial gluedown Karndean flooring, and a COREtec basement replacement.

Local showroom

2516 Berlin Turnpike, Newington, CT 06111

Recent local proof

7 completed projects • September 2026

Project support

Floating and gluedown luxury vinyl, appliance moving, toilet removal and resetting, door clearance, subfloor preparation, transitions, hardwood sanding and refinishing, stair treads, carpet removal, kitchen-remodel coordination, and carpet repair

Residential and commercial highlights

Featured Berlin projects by customer type.

Residential and commercial projects are labeled at a glance. Open any case study for the complete scope, preparation, materials, and available photography.

View All Berlin Projects
Featured

Residential Project

Installation
Karndean Sterling Quartzite stone-look flooring connecting a Kensington kitchen with stainless steel appliances and a laundry area
Completed Sterling Quartzite flooring through the Kensington kitchen and laundry area in September 2026.

Floating Sterling Quartzite Flooring in a Kensington Kitchen and Laundry

Completed September 2026 • Berlin, CT

332 sq. ft. floating installationKarndean Sterling QuartziteFour appliances moved
Featured

Commercial Project

Installation
Karndean Opus Natural Walnut gluedown luxury vinyl installed in an open Berlin commercial interior
Completed Karndean Opus Natural Walnut flooring after extensive concrete preparation in Berlin.

Walnut-Look LVP for a Tabletop Gaming Space

Completed August 2026 • Berlin, CT

The business name and exact address are withheld for customer privacy.

936 sq. ft. gluedown luxury vinyl870 sq. ft. skim coatCommercial installation

Featured flooring work

More selected work by flooring type.

Featured

Luxury Vinyl Plank Project

Installation
COREtec Norwegian Maple luxury vinyl plank installed through a Berlin basement living area and hallway
Completed COREtec Norwegian Maple flooring across a Berlin basement living area and hallway.

Basement Laminate Replaced With LVP

Completed July 2026 • Berlin, CT

Laminate removalMoisture barrierCOREtec LVP
Featured

Luxury Vinyl Tile Project

Installation
Completed Karndean Art Select Sterling Quartzite gluedown LVT floor in a Kensington kitchen under renovation
The completed Sterling Quartzite floor spans the kitchen and doorway edges while the larger kitchen remodel continues around it.

Stone-Look LVT for a Kitchen Remodel

Completed August 2026 • Berlin, CT

The customer's identity, exact address, general contractor's identity, estimate pricing, and internal layout are not published. All three approved photographs document the flooring work during the ongoing kitchen remodel and contain no customer-identifying details.

356 sq. ft. incl. 10% wasteSterling Quartzite LVTOne-day flooring scope
Featured

Hardwood Project

Refinishing
Natural refinished hardwood in a Berlin entry and living room beside the finished wood stair treads
After refinishing: the view from the entry shows the natural water-based finish on the hardwood floor and stair treads.

Hardwood Floors and Stairs Refinished

Completed September 2026 • Berlin, CT

282 sq. ft. refinished12 stair treadsNatural water-based finish
Featured

Carpet Project

Repair
Finished basement carpet after a restretch and pad replacement in Kensington, Connecticut
Finished after view of the retained Kensington basement carpet following new cushion, corrected tack strip placement, restretching, and a new vinyl transition.

Basement Carpet Restretched With New Pad

Completed August 2026 • Berlin, CT

The customer's identity and exact address are withheld. The published image is cropped to exclude personal photographs, and the internal room layout and estimate are not published.

272 sq. ft. restretchedTahoe SpillGuard cushionCompleted in a few hours

More project paths

Compare more work without repeating a local project.

A project appears only once on this town page. These links fill the remaining sector and flooring categories with relevant statewide work or a live flooring catalog.

Berlin flooring planning

Compare the flooring and the full project scope locally.

Floors Now is based on the Berlin Turnpike in Newington and considers flooring projects in Berlin. Bring room details, inspiration, or a product question to the showroom, or start online so our team can review the rooms, existing floor, project goals, and timing.

Berlin flooring FAQ

Questions to settle before the project begins.

What flooring was installed in the September 2026 Kensington kitchen and laundry project?

The project used Karndean Art Select Sterling Quartzite stone-look luxury vinyl tile with a floating installation. The 332-square-foot installation scope included subfloor leveling with Proma Pro Patch, removal and disposal of 16 square feet of VCT, moving four appliances, removing and resetting one toilet, cutting one door for clearance, and fitting two T-moldings and two threshold/end caps.

What did the Berlin hardwood refinishing project include?

Completed in September 2026, the project included removing and disposing of 352 square feet of carpet, sanding and refinishing 282 square feet of existing hardwood in the living room and entry, and refinishing 12 stair treads. The wood was left natural with a water-based finish and no stain.

Which photos show the sanded and finished hardwood?

The project gallery begins with the living-room floor after sanding and before finishing. The next two photographs show the refinished floor, including a view from the entry beside the stairs and a second view across the living room.

Did Floors Now remove the carpet for the commercial Karndean project?

No. The old carpet had already been removed before Floors Now arrived. The crew scraped the remaining carpet adhesive from 870 square feet of exposed concrete and prepared the surface for the gluedown installation.

How was the concrete prepared for gluedown LVP?

This project included scraping leftover adhesive, applying patch primer, and skim coating 870 square feet with Planiprep SC. Preparation requirements vary with the concrete condition and selected flooring system.

Can VCT removal be included with a commercial LVP project?

Yes. This Berlin project included removing and disposing of 49 square feet of VCT before the new flooring was installed.

Can toilet removal and cove base be coordinated with commercial flooring?

Yes, when included in the agreed scope. This project included removing and resetting one toilet and installing 56 pieces of cove base.

Does every basement LVP installation need a moisture barrier?

Not automatically. The substrate, moisture conditions, flooring construction, underlayment, and manufacturer instructions determine whether a separate moisture barrier or another moisture-control system is required.

Does a basement slab need to be perfectly level for LVP?

Not necessarily, but it must meet the selected flooring manufacturer's flatness and stability requirements. Localized high spots, low spots, cracks, or damaged areas may need preparation even when the slab has a consistent overall slope.

Is the carpet restretch project in Berlin or Kensington?

The project was completed in Kensington, a village within the Town of Berlin. It appears on the Berlin town page while its project title and case study identify Kensington clearly.

Did Floors Now install new carpet during the Kensington restretch?

No new carpet material was supplied. The existing finished-basement carpet was retained, set over 300 square feet of new Tahoe 8-pound, 7/16-inch cushion with SpillGuard, and restretched across approximately 272 square feet.

Why was the carpet pad replaced in Kensington?

The verified project information confirms that new cushion was requested and installed but does not state why the customer wanted the pad replaced. No unsupported cause is assigned to the replacement.

How long did the Kensington carpet repair take?

The new cushion, corrected tack strip, carpet restretch, and vinyl transition were completed in a few hours. The retained carpet already had pulls along some edges, and the customer understood that those existing conditions could limit the final appearance.

Plan a Berlin flooring project

Tell us which rooms and flooring you are considering.

Share whether the Berlin project is residential or commercial, the existing flooring and substrate, preferred material, access or operating needs, moisture concerns, and timing. Our team will review the scope and follow up about the most practical next step.

Step 1 of 2

Project basics

How can we help?

What would you like to do?
What type of project is it?

No measurements or street address needed to get started.