Verified flooring case study • Meriden, CT • Completed August 2026

Marble-Look LVP Kitchen Installation

Install a marble-look floating floor over the retained sheet vinyl and complete the required appliance, molding, and transition work

Residential Project · Residential Home

Half-day kitchen project18-by-24-inch rigid-core LVTInstalled over sheet vinyl
Engagement
Residential Project · Residential Home
Supplied flooring material
157 square feet; supplied quantity, not exact installed coverage
Elapsed work time
Half a day

The problem

How long does it take to install a marble-look kitchen floor?

The kitchen in this Meriden home had an older sheet vinyl floor laid over a concrete slab, and the homeowners wanted a marble-look replacement. When a floating rigid-core floor goes in, the critical question is the surface underneath: a floating floor locks together and rests on top of the existing surface rather than being glued or nailed down, so it needs that surface to be clean, dry, flat, and stable.

Here the existing sheet vinyl met that bar. The crew reviewed it, found it sufficiently flat for the selected floating system, and kept it in place — which meant the verified scope needed no patching, leveling, or other additional surface preparation before the new floor went down.

The decision was between tearing out the old floor and installing over it. Because the sheet vinyl was secure and flat, a tear-out would have added disposal and subfloor work without changing the finished result, so the practical call was a floating installation over the retained vinyl. The Karndean Korlok Select Brunella Marble rigid-core tile was installed as the new floating kitchen floor in half a day.

Project overview

The goal, materials, and finished scope.

In August 2026, Floors Now completed a half-day residential kitchen flooring project in Meriden using Karndean Korlok Select Brunella Marble RKT3013-G. The 18-by-24-inch rigid-core luxury vinyl tile was installed as a floating floor over the existing sheet vinyl on the concrete slab after the surface was found sufficiently flat for the selected system. Floors Now supplied 157 square feet of material; that figure represents supplied material rather than the exact installed coverage. The coordinated scope also included moving and resetting two appliances, removing and reinstalling 30 linear feet of existing baseboard, installing 32 linear feet of new primed quarter-round, and completing the adjoining edges with one T-molding and one threshold.

Project facts

Completed
August 2026
Documented scope
Residential floating rigid-core luxury vinyl tile kitchen installation
Property type
Residential Home
Rooms
Kitchen
Flooring
Karndean Korlok Select Brunella Marble RKT3013-G 18-by-24-inch rigid-core luxury vinyl tile
Project goal
Install a marble-look floating floor over the retained sheet vinyl and complete the required appliance, molding, and transition work

Project photography

The finished result.

Each image and caption identifies the portion of the verified project that is actually shown.

White marble-look Karndean Korlok Select Brunella Marble rigid-core luxury vinyl tile installed in a Meriden kitchen with dark cabinets
View 1.Completed 18-by-24-inch Karndean Korlok Select Brunella Marble rigid-core LVT across the Meriden kitchen.

Scope of work

What we did, step by step.

A half-day floating LVT installation over retained sheet vinyl, with appliance, molding, and transition work.

  1. Reviewed the existing sheet vinyl over the concrete slab and retained it because the surface was sufficiently flat for the selected floating floor
  2. Completed the verified flooring scope without patching, leveling, or other additional surface preparation
  3. Supplied 157 square feet of Karndean Korlok Select Brunella Marble RKT3013-G material
  4. Installed the 18-by-24-inch rigid-core luxury vinyl tile as a floating kitchen floor
  5. Moved and reset two appliances as part of the flooring work
  6. Removed and reinstalled 30 linear feet of existing baseboard molding
  7. Installed 32 linear feet of new primed quarter-round
  8. Finished the adjoining edges with one T-molding and one threshold
  9. Completed the project in half a day

Common questions

Questions homeowners ask about this kind of project.

What is a floating floor?

It's a floor that isn't glued or nailed to what's underneath — the tiles lock together and rest on the existing surface as one connected layer. Here we installed the marble-look rigid-core luxury vinyl tile as a floating kitchen floor over the retained sheet vinyl.

Why keep the old sheet vinyl instead of removing it?

We keep it when the existing surface is secure and flat enough for the selected floor. In this kitchen the sheet vinyl over the concrete slab was sufficiently flat, so the verified scope needed no patching or leveling. When the existing floor is damaged, loose, or uneven, removal is the better call.

How was this kitchen floor finished in half a day?

The floating installation went over the retained sheet vinyl with no patching or leveling required, and a floating floor has no adhesive that needs to cure. The half-day scope also included moving and resetting two appliances, removing and reinstalling the existing baseboard, and adding new quarter-round with a T-molding and threshold at the adjoining edges.

Does the material quantity tell me how big my kitchen is?

Not exactly. The 157 square feet here is the supplied material quantity, not the exact installed coverage — material is ordered with cutting waste and spare pieces in mind, so it's larger than the finished floor area.

Products and planning

Planning a similar flooring project?

Use these resources to compare the materials, preparation, and installation services involved in this project.

Flooring Advice

Go deeper on luxury vinyl.

Focused answers for the questions that need more room than a buyer's guide.

Browse all Flooring Advice

Plan a project like this Meriden installation

Tell us about your rooms, flooring, and project goals.

Share the location, rooms, existing floors, materials you are considering, known preparation needs, and timing. Floors Now will review the details and follow up about the most practical next step.

Step 1 of 2

Project basics

How can we help?

What would you like to do?
What type of project is it?

No measurements or street address needed to get started.

Get a free estimate