Verified flooring case study • Colchester, CT • Completed August 2026

Madoc Coracle Carpet and AE400 Rubber Gym Flooring

Complete the carpet and home-gym flooring portion of a basement restoration while coordinating around gym equipment

Case study published

Residential Project · Residential Home

One workday, one visit27 waterfall stairs405 sq. ft. AE400 rubber
Engagement
Residential Project · Residential Home
Supplied material quantities
774 sq. ft. of carpet and pad plus 405 sq. ft. of rubber tiles; quantities include cuts and waste
Elapsed work time
One workday in one visit

Project overview

The goal, materials, and finished scope.

In August 2026, Floors Now completed the flooring portion of a Colchester basement restoration in one workday and one visit. The crew removed and disposed of 866 square feet of old carpet, installed Madoc carpet in the official Coracle color with new pad throughout the planned basement areas, and carpeted both staircases in the waterfall style for a total of 27 stairs. The supplied carpet-and-pad quantities were 654 square feet for the basement and basement staircase plus 120 square feet for the main staircase; those figures include cuts and waste. The verified finish work included 40 linear feet of tack strip, 25 linear feet of vinyl transition, 3 linear feet of flat silver metal, 3 linear feet of pin metal, and removal and reset of 30 linear feet of baseboard. In the gym, the team installed 405 square feet of Advanced Edge Sports Flooring AE400 interlocking rubber tiles in the official Back in Black color, also including cuts and waste. The tiles were interlocked without adhesive over the older underlayment already in place; no new underlayment or patching was installed. The installers moved and worked around gym equipment as the one-visit installation progressed.

Project facts

Completed
August 2026
Documented scope
Residential basement carpet, stair carpet, and rubber gym flooring installation within a restoration project
Property type
Residential Home
Customer type
Restoration Company
Rooms
Finished basement, basement staircase, main staircase, and home gym
Flooring
Madoc carpet in Coracle with new pad; Advanced Edge Sports Flooring AE400 interlocking rubber tiles in Back in Black
Project goal
Complete the carpet and home-gym flooring portion of a basement restoration while coordinating around gym equipment

Project photography

Available views from the project.

Each image and caption identifies the portion of the verified project that is actually shown.

Madoc Coracle carpet on a Colchester basement staircase beside black rubber gym flooring
View 1.Finished Madoc Coracle carpet on the basement staircase, with the carpeted basement area to the right and interlocking AE400 rubber gym flooring to the left.
Madoc Coracle carpet installed through a finished Colchester basement passage
View 2.The completed Coracle carpet continues through the restored basement passage and adjoining carpeted areas.
Madoc Coracle carpet beside Advanced Edge AE400 black rubber gym flooring in a Colchester basement
View 3.The last approved view shows the finished carpet and Back in Black AE400 rubber zones immediately after installation while the couch, protective plastic, and gym equipment were still being moved into place.

Scope of work

A one-visit basement restoration scope joined new carpet, two waterfall staircases, and interlocking rubber gym flooring.

  • Coordinated the flooring work as part of a restoration-company partnership project
  • Removed and disposed of 866 square feet of old carpet across the two listed removal areas: 498 and 368 square feet
  • Installed 654 square feet of Madoc carpet in the official Coracle color for the planned basement and basement-stair scope
  • Installed another 120 square feet of Madoc Coracle carpet for the main staircase; the carpet quantities include cuts and waste
  • Installed new carpet pad throughout the complete carpeted scope
  • Completed 27 waterfall-style carpeted stairs: 13 basement stairs and 14 main stairs
  • Installed 40 linear feet of tack strip and 25 linear feet of vinyl transition
  • Installed 3 linear feet of flat silver metal and 3 linear feet of pin metal
  • Removed and reset 30 linear feet of baseboard molding
  • Installed 405 square feet of Advanced Edge Sports Flooring AE400 interlocking tiles in Back in Black to the planned room edges; the quantity includes cuts and waste
  • Interlocked the rubber tiles without adhesive over the older existing underlayment; no new underlayment or patching was installed
  • Moved and worked around gym equipment while completing the installation in one workday and one visit

Products and planning

Research the flooring and installation details.

Use these resources to compare the materials, preparation, and installation services involved in this project.

Flooring Advice

Go deeper on carpet.

Focused answers for the questions that need more room than a buyer's guide.

Browse all Flooring Advice

Plan a project like this Colchester installation

Tell us about your rooms, flooring, and project goals.

Share the location, rooms, existing floors, materials you are considering, known preparation needs, and timing. Floors Now will review the details and follow up about the most practical next step.

Step 1 of 4

About 60 seconds

What flooring is involved?
What type of project is it?
Who will handle installation?